Go Back   ManagementParadise.com | Management & Business Education Learning Platform PUBLISH / UPLOAD PROJECT OR DOWNLOAD REFERENCE PROJECT > Public Relations Management .

six sigma

Discuss six sigma within the Public Relations Management . forums, part of the PUBLISH / UPLOAD PROJECT OR DOWNLOAD REFERENCE PROJECT category; Define design goals that are consistent with customer demands and the enterprise strategy. Measure and identify CTQs (characteristics that are ...

Reply

 

Thread Tools Display Modes
six sigma
Old
 (1 (permalink))
Aparna Thakur
aparna.t is an unknown quantity at this point
 
aparna.t
Student of B.Com
Indore, Madhya Pradesh
Status: Offline
Posts: 1
Join Date: Mar 2010
Location: Indore, Madhya Pradesh
Smile six sigma - September 7th, 2010

Define design goals that are consistent with customer demands and the enterprise strategy.

Measure and identify CTQs (characteristics that are Critical To Quality), product capabilities, production process capability, and risks.

Analyze to develop and design alternatives, create a high-level design and evaluate design capability to select the best design.

Design details, optimize the design, and plan for design verification. This phase may require simulations.

Verify the design, set up pilot runs, implement the production process and hand it over to the process owner(s
Advertisements

Friends: (0)
Reply With Quote
Re: six sigma
Old
 (2 (permalink))
Jitendra Mazee
jiten005 is an unknown quantity at this point
 
jiten005
Management Paradise Guru
Status: Offline
Posts: 5,316
Join Date: Jan 2018
Re: six sigma - January 19th, 2018

Quote:
Originally Posted by aparna.t View Post
Define design goals that are consistent with customer demands and the enterprise strategy.

Measure and identify CTQs (characteristics that are Critical To Quality), product capabilities, production process capability, and risks.

Analyze to develop and design alternatives, create a high-level design and evaluate design capability to select the best design.

Design details, optimize the design, and plan for design verification. This phase may require simulations.

Verify the design, set up pilot runs, implement the production process and hand it over to the process owner(s
Hey, thanks for your help and sharing the information on six sigma. Well, i have also a document and uploading it where you would get more information on six sigma.
Attached Files
File Type: pdf six sigma.pdf (884.0 KB, 0 views)
Friends: (0)
Reply With Quote
Reply

Bookmarks

Tags
notes on six sigma, project on six sigma, sigma, six sigma
Related to six sigma
 

Similar Threads

Thread Thread Starter Forum Replies Last Post
SIX SIGMA Daipayan Lodh Infosystems 11 February 27th, 2016 02:52 PM
Six Sigma Praveen Nair Banking and Insurance Final 100 marks projects 9 February 24th, 2016 03:30 PM
TVS SIX SIGMA Abhijeet S Materials Management 0 September 1st, 2010 05:59 PM
six sigma Ankit Gokani Productivity and Quality Management [T.P.Q.M] 3 August 2nd, 2010 09:37 PM
What is the difference between Six Sigma Green Belt and Six Sigma Black Belt ? Gargi Naik Marketing Management ( RM , IM ) 1 March 6th, 2010 09:35 PM
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On
Trackbacks are On
Pingbacks are On
Refbacks are Off


ManagementParadise.com is not responsible for the views and opinion of the posters. The posters and only posters shall be liable for any copyright infringement.



Search Engine Optimization by vBSEO ©2011, Crawlability, Inc.