Process Of Production / Manufacturing

 Bunching As Per Size - After the completion of job work, the copper wires are bunched as per the required size. Bunching increases the current carrying capacity of wires.

 Passing Of Wire Through Nozzle - The wires are then passed through the nozzle to see if they are of the proper size.

 Inserting PVC & Master Batch - PVC is heated with master batch as per required colour, inserted into the extruder. When the colour of the wire is white no master batch is added.

 Cooling - During the previous stage the wire gets heated, thus it is cooled by passing the wire through the water bath.

 Spark Testing - Here we test the sparks emitted by the wires.

 Naming - This process involves the name of the company to be printed on the cable wires.

 Coiling - The wires are coiled so that they can be packed.

 ISI Testing - From every batch of production of 50, a sample has to be sent to the ISI for testing.

 Packaging - The wires are then packed in boxes. This is the primary packing. The secondary packing takes place only after the order is received from the customer.
 
Process Of Production / Manufacturing

 Bunching As Per Size - After the completion of job work, the copper wires are bunched as per the required size. Bunching increases the current carrying capacity of wires.

 Passing Of Wire Through Nozzle - The wires are then passed through the nozzle to see if they are of the proper size.

 Inserting PVC & Master Batch - PVC is heated with master batch as per required colour, inserted into the extruder. When the colour of the wire is white no master batch is added.

 Cooling - During the previous stage the wire gets heated, thus it is cooled by passing the wire through the water bath.

 Spark Testing - Here we test the sparks emitted by the wires.

 Naming - This process involves the name of the company to be printed on the cable wires.

 Coiling - The wires are coiled so that they can be packed.

 ISI Testing - From every batch of production of 50, a sample has to be sent to the ISI for testing.

 Packaging - The wires are then packed in boxes. This is the primary packing. The secondary packing takes place only after the order is received from the customer.

Hey sunanda, thanks for sharing such a nice information about the process of production and manufacturing at Finolex. Well, as we know that he Finolex Group consists of Finolex Cables Ltd., Finolex Industries Ltd., Finolex J-Power Systems Ltd. and Finolex Plasson Industries Ltd. For more details, please download my presentation.
 