<?xml version="1.0" encoding="ISO-8859-1"?>

<rss version="2.0" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/">
	<channel>
		<title><![CDATA[ManagementParadise.com - Your MBA Online Degree Program and Management Students Forum for MBA,BMS, MMS, BMM, BBA, students & aspirants. - Miscellaneous Project Reports]]></title>
		<link>http://www.managementparadise.com/forums/</link>
		<description />
		<language>en</language>
		<lastBuildDate>Sat, 21 Nov 2009 18:53:49 GMT</lastBuildDate>
		<generator>vBulletin</generator>
		<ttl>60</ttl>
		<image>
			<url>http://www.managementparadise.com/forums/images/aria/misc/rss.jpg</url>
			<title><![CDATA[ManagementParadise.com - Your MBA Online Degree Program and Management Students Forum for MBA,BMS, MMS, BMM, BBA, students & aspirants. - Miscellaneous Project Reports]]></title>
			<link>http://www.managementparadise.com/forums/</link>
		</image>
		<item>
			<title>construction of RO building project synopsis</title>
			<link>http://www.managementparadise.com/forums/miscellaneous-project-reports/161293-construction-ro-building-project-synopsis.html</link>
			<pubDate>Sat, 07 Nov 2009 13:24:15 GMT</pubDate>
			<description>Project Synopsis : 
 
1.1)	Name of the Project:- Construction of RO Building– Common Wealth Games-2010 					Operations. 
1.2)	Project Duration :- 16...</description>
			<content:encoded><![CDATA[<div>Project Synopsis :<br />
<br />
1.1)	Name of the Project:- Construction of RO Building– Common Wealth Games-2010 					Operations.<br />
1.2)	Project Duration :- 16 months.<br />
1.3)	Start Date : 6-12-2008.<br />
1.4)	End Date: 05-3-2010.<br />
1.5)	Project Cost:<br />
Rs.  49,69,35,503.82.{ Forty Nine Crores sixty nine lakhs thirty five thousand five hundred three and paisa eighty two only}<br />
1.6)	Project Overview:- <br />
The project comprises of construction of Regional Office for the operations of Common Wealth Games 2010 to be held in New Delhi.<br />
Information about the site:<br />
The site is located block GB, Block Of D.D.A Housing Complex, Sarojni Nagar, New Delhi-11007.<br />
The total area is aprox. 8000 sq. M.<br />
<br />
1.7)	Scope of work:<br />
The Proposed regional office building is comprising of two six storied structures of identical character one for Operations team and other for the assistance department for  the Common wealth Games 2010. The complex also proposed to have a convention centre with a 300 capacity auditorium and two conference halls with allied facility .A large central atrium along with space frame and skylight is located at the centre.<br />
The scope of work covers the entire construction, different heads are as follows:<br />
1. Pile and Pile caps.<br />
2. Civil and Structural work.<br />
3. Finishing Works (internal and external).<br />
4. Internal and external electrification.<br />
5. Electrical substation and Generators.<br />
6. Sanitary, water supply and drainage works.<br />
7. Interior works.<br />
8. Local Area Networking.<br />
9. Deep tubewell, Iron removal plant, STP<br />
10. Auditorium sound and projection system, auditorium stage lighting, stage crafting.<br />
11. Area development, landscaping, roads and pavement.<br />
12. Other misc. works as required.<br />
 <br />
1.8)	Cost Breakup of the work:-<br />
<br />
Si. No.	Description	Cost<br />
1	Civil and Road Works	 <br />
 	As Per DSR-2007	308969471.42<br />
 	As Per Non DSR	85013393.69<br />
2	Sanatry water supply &amp; Drainage 	 <br />
 	As Per DSR-2007	5213871.3<br />
 	As Per Non DSR	1975518.93<br />
3	Tube Well Pump	4568363.86<br />
4	Internal Electric Works	 <br />
 	As Per DSR-2007	5528825.9<br />
 	As Per Non DSR	10816173.83<br />
5	External Electric Works	 <br />
 	As Per DSR-2007	1796616<br />
 	As Per Non DSR	14211791<br />
6	Fire Fighting System	14320686.82<br />
7	Auditorium System {sound light &amp; stagr craft}	 <br />
 	 	5885921.36<br />
 	 	1994427.1<br />
8	Miscellaneous	 <br />
 	8.1 Modular Furniture	23764620.6<br />
 	8.2 LAN System	10551670.9<br />
 	8.3 Horticulture	979854.3<br />
 	8.4 CCTV	1344296.81<br />
 	 	 <br />
 	Total:	496935503.8</div>

]]></content:encoded>
			<category domain="http://www.managementparadise.com/forums/miscellaneous-project-reports/">Miscellaneous Project Reports</category>
			<dc:creator>kunalmunshi</dc:creator>
			<guid isPermaLink="true">http://www.managementparadise.com/forums/miscellaneous-project-reports/161293-construction-ro-building-project-synopsis.html</guid>
		</item>
		<item>
			<title>Slum Rehabilitation - A relief management technique</title>
			<link>http://www.managementparadise.com/forums/miscellaneous-project-reports/161199-slum-rehabilitation-relief-management-technique.html</link>
			<pubDate>Sat, 07 Nov 2009 08:17:44 GMT</pubDate>
			<description><![CDATA[plz help me for my project its '"'slum rehabilation a relief management technique"]]></description>
			<content:encoded><![CDATA[<div>plz help me for my project its '&quot;'slum rehabilation a relief management technique&quot;</div>

]]></content:encoded>
			<category domain="http://www.managementparadise.com/forums/miscellaneous-project-reports/">Miscellaneous Project Reports</category>